Babyn Yar

Kiev, Ukraine
Competition project phase 1
2019

Partners
Hannes Stiefel
Projektpartner | Project Partners
Georg Böhm
Projektpartner | Project Partners

Collaborators

Projektarchitekt | project architect
Mitarbeiter | Collaborator
Mitarbeiter | Collaborator
Mitarbeiter | Collaborator

Consultants
Günter Vogt, Lars Ruge, Thomas Boyer
Freiraumplanung | open space planning and outdoor facilities
Peter Bauer
Tragwerksplanung | Structural Engineering
Armin Hess
Renderings und Bildbearbeitung | Renderings and digital imaging
Diagrams 33/3
Babyn Yar Schema landscape_page_1
 
 
Babyn Yar Schema landscape_page_2
 
 
Babyn Yar Schema landscape_page_3
 
 
Babyn Yar Schema landscape_page_4
 
 
Babyn Yar Schema landscape_page_6
 
 
Babyn Yar Schema landscape_page_7
 
 
Babyn Yar Schema landscape_page_5
 
 
zoom
Babyn Yar Schema utilisation_concept_page_06
 
 
Babyn Yar Schema utilisation_concept_page_04
 
 
Babyn Yar Schema utilisation_concept_page_07
 
 
Babyn Yar Schema utilisation_concept_page_03
 
 
Babyn Yar Schema utilisation_concept_page_08
 
 
Babyn Yar Schema utilisation_concept_page_10
 
 
Babyn Yar Schema utilisation_concept_page_02
 
 
Babyn Yar Schema utilisation_concept_page_010
 
 
Babyn Yar Schema utilisation_concept_page_11
 
 
zoom
Babyn Yar Schema exhibition_page_1
 
 
Babyn Yar Schema exhibition_page_2
 
 
Babyn Yar Schema exhibition_page_3
 
 
Babyn Yar Schema exhibition_page_4
 
 
Babyn Yar Schema exhibition_page_5
 
 
zoom
Views 33/3
Babyn Yar Ansichten c04c30
The GROUND itself is the historical document, the script that contains all of history, starting with the formation of Kyiv’s original topography and swallowing all atrocities of all times. Thus no building can ever touch the GROUND in Babyn Yar. And especially, no building can ever be BURRIED in the ground of Babyn Yar. And….no profane function nor everyday activity can ever be INSERTED into the GROUNDS of Babyn Yar. Instead, a chunk of GROUND, a volume modelled in parts after the site´s geological layers is hovering 17m above the ground, as a carrier for activities listed by project´s brief. Thus the building is neither eliminating GROUND nor pushing aside GROUND. Like a roof it is sheltering and protecting a portion of approx. 6.400 m2 of GROUND. In wintertime, on this area no snow will fall. In summertime the roof will cast a vast shadow onto the site causing a temperature always a few degrees below that of the surrounding terrain. Snow and sun are suspended. However, through a GAP in the raised volume a few rays of sunlight find their way on certain days of the year. Those rays will draw a fragmented bridge of light between the invisible edges of the ravine.  
Babyn Yar Holocaust Gedenkzentrum - BYHMC  
Babyn Yar Ansichten c04c3_crop04a
Babyn Yar Holocaust Memorial Center - BYHMC  
Babyn Yar Holocaust Gedenkzentrum - BYHMC  
Babyn Yar Ansichten c04c3_crop060
Babyn Yar Holocaust Memorial Center - BYHMC  
Babyn Yar Holocaust Gedenkzentrum - BYHMC  
zoom
Babyn Yar Ansichten 042northunder
 
 
Babyn Yar Ansichten 041southunder
 
 
zoom
Babyn Yar Ansichten 010north
 
 
Babyn Yar Ansichten 020west
 
 
Babyn Yar Ansichten 030south
 
 
Babyn Yar Ansichten 031south
 
 
Babyn Yar Ansichten 032south
 
 
Babyn Yar Ansichten 033south
 
 
Babyn Yar Ansichten 034south
 
 
zoom

Click & drag to move images

Scroll to zoom images